fbpx
FAQ
Yes. but a labor/equipment fee will be applied.
Yes, but keep in mind that adding a porch will take away from the length of the storage since it’s built within the building.
Yes. There will be an extra service charge. The original carport must be an American Steel Carport. In order to add walk-in or overhead or roll-up doors, the original carport must be 6 foot or taller.
You need to contact your local building department.
Yes, with pre-requisites. We will need the additional information below. 1. Is the boat dock a floating dock? or a dock that is connected to the lake bed? or the side of the lake? 2. We will need pictures of the boat dock and surrounding area. 3. We will need pictures of the pathway to the boat dock. Once we have this information we can check to see if we can approve the request. PLEASE NOTE: THERE WILL BE ADDITIONAL LABOR FEES DUE TO LIABILITY ISSUES AND THE INSTALLERS SAFETY.
You can choose a different color top, trim, sides, and ends at no additional charge from our standard 12 color choices.
All of our buildings are leak-proof. However, when it comes to 31’ buildings and longer, we strongly recommend our A-Frame Vertical roof which can prevent future leaks in the long term.
Standard buildings are assembled in about an hour but it may take up to two days depending upon the size and type of structure.
Delivery usually takes 2-6 weeks in most areas. Please call for an updated time frame for your local area. All shipping dates are approximate and are computed from the date of entry of the order on American Steel’s books (system).
Width x Length x Height (ex. 18 x 21 x 5) Length dimension is measured by the roof metal with 6″ overhang on each end. Therefore, the bottom base rail is one foot shorter than the roof. Width is measured from outside base rail to the other outside base rail.
12’ is a standard leg height, anything above 12’ can be done.
Pitch on the roof is 3/12 & 4/12, but the pitch can be customized to fit your needs.
All orders are COD. We accept personal or cashier’s checks, money order, Visa, Master Card, American Express and Discover.
Once an order is placed and the 10% down payment is received you are eligible for a set of engineered certified plans that will give you the recommendation for your concrete pad.
3 foot temporary pin anchors ground and clay or asphalt installation (not responsible if you choose pin anchors only)
Double helix mobile home anchors for ground and clay installation only (extra cost) Concrete anchors for concrete installation only (extra cost)
The vertical roof lets water, snow, etc. run off quickly and does not let it pond up on the roof.